Construction waste

Waste loading and removal is performed by trucks equipped with lifting and loading equipment. They can collect and remove from 8 to 15 m3 of waste and their lifting capacity is from 10 to 18 tons. If necessary, we deliver construction waste containers to customer’s territory and replace filled containers with empty ones. If need be, removal schedule is coordinated with a customer or waste is removed periodically. Container capacity varies from 15 to 30 m3. Recycled construction waste is often used in road construction, foundation laying and only in the absence of such possibility, it is transferred to regional landfills.

© Copyright 2011 ATT